Our References

GEO From Your Eyes:
Play Video
Play Video
Play Video
All References:

2021

KANSAI ALTAN

Dg installation construction.
Engineering and Design
Chemical
Dye

SCHNEIDER

Ekrt 60 furnace service.
Maintenance and Repair
Energy
Transformer and Electricity

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

FELDA IFFCO

General piping and services have been provided throughout 2020.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Food
Vegetable Oil

2018

BiLLUR TUZ

Approximately 85 m2 rusted natural gas lines have been revised andreplaced.
Installation and Commissioning
Maintenance and Repair
Food
Salt

TUBORG & CARLSBERG

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Beverage
Alcoholic Beverage

2016

FELDA IFFCO

Design and manufacturing, erection of economizer together with system piping and energy recovery measuring to the main boiler house.
Project Design and Contracting
Food
Vegetable Oil

OMYA MADENCiLiK SAN AŞ

The project design, mechanical installation, piping and machine installation work related to the process has been completed.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing

2015

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

TUKAŞ GIDA SAN AŞ

Within the scope of the project , steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed. In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled. 2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated. Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

SÜTAŞ AŞ

Within the scope of the project which started in the second half of 2015, natural gas facilities and installations were completed in our project and contracting teams in Tire - İZMİR new factory investment.
Installation and Commissioning
Project Design and Contracting
Food
Dairy

2014

ALTINYAĞ KOMBiNALARI AŞ

Within the scope of the project to be realized at Altınyağ facilities, the serpentine pipes of 3 oil tanks will be replaced. Assembly and commissioning are planned to be completed within 1 month
Maintenance and Repair
Supply and Assembly
Food
Vegetable Oil

2012

ÖZKAN DEMiR ÇELiK SAN AŞ

New plant steel annealing furnaces natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . New plant for capacity increasing and quality improvement of sand blasting system natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning ."
Installation and Commissioning
Project Design and Contracting
Metal

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant fire fighting system design and engineering, procurement, installation with automation and commissioning. New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning. Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

AGE ENERGY

All simple cycle steam manufacturing and installation of piping of 80 MW naturalgas fired private business entity power plant
Engineering and Design
Project Design and Contracting
Energy

NESTLE

Design and engineering, procurement, installation and commissioning of natural gas distribution to many facilies of the plant under hygenic standarts
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Chocolate

2010

KOROZO AMBALAJ SAN TiC AŞ

Solvents piping and ventilation system design and installation , engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

"New steel production plant whole furnaces and other facilities natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning. Role mill plant capacity increasing and quality improvement of 4th furnace natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Metal

2009

BEST Transformer AŞ

Heating and cooling of administrative building with VRF systems, air conditioning, heat recovery, hot water supply through solar energy systems.
Engineering and Design
Project Design and Contracting
Energy
Transformer and Electricity

BEST Transformer AŞ

Day lighting skylight application for interior lighting of management building, energy supply from hybrid systems including small scale wind turbines and sun tracking PV panels.
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST Transformer AŞ

"Best Elektromekanik San. Inc. Installation of Wind Turbine and Photovoltaic Piller from Renewable Energy Sources has been completed in Organize Industrial Zone Facilities Management Block. With the automation system installed, the amount of energy produced in the hybrid system has begun to be read. In addition, the management block rooms were started to be energized without electricity by ""Natural Light Lighting Fixtures"". In the management block, the use of water system, fire system, VRF system, air conditioning, conference room air conditioning, ventilation system, shelter ventilation and building hot water system were completed and put into operation."
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

2007

ALCAN PACKAGING AŞ

GEO realized engineering, procurement, installation and commissioning of HVAC for new management building and cooling and ventilation duct work installation for two new package production lines together with automation and SCADA system.
Engineering and Design
Installation and Commissioning
Packaging and Paper

2006

TAMSA SERAMiK AŞ

Engineering, procurement, installation and commissioning of natural gas installations for new process units.
Installation and Commissioning
Supply and Assembly
Mineral Processing
Ceramic

TAT KONSERVE

Engineering, procurement, installation and commissioning of natural gas system for entire factory.
Installation and Commissioning
Project Design and Contracting
Food
Canned Good

2005

PHILIP MORRIS AŞ

Vacuum lines and vacuum pumping station engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Tobacco

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

EGE ENDÜSTRi SAN AŞ

Boiler room design, procurement, installation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

KLiMASAN KLiMA SAN VE TiC AŞ

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Home/Industrial Appliance

ENERCON AERO

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Energy
Wind

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

DYO Paint

Fire extinguishing pipe lines design, procurement, installation and commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Chemical
Dye

SAKIPAĞA SGS GIDA

Steam lines design, procurement, installation and commissioning.
Project Design and Contracting
Supply and Assembly
Food
Dairy

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BIANCHI BiSiKLET ENDÜSTRi AŞ

Design, procurement, installation and commissioning of natural gas lines and burners for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Bike

TAT KONSERVE

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas supply and monitoring equipments for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

BOSCH Heating and Cooling

Design, procurement, installation and commissioning of natural gas lines for entire factory
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Home/Industrial Appliance
Heating Appliance

YÖRSAN GIDA SÜT ENDÜSTRi AŞ

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Food
Dairy

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

3 MW Superheated water boiler system engineering, procurement, installation and commissioning with automation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

ROBERT BOSCH AŞ

Design of Boiler house with whole system 3 MW additional hot water boiler and installation of the entire system
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Vehicle
Automotive

1998

ERDEMİR

Erdemir No. 4 lime kiln natural gas conversion project Installation of Pressure Reduction Station
Installation and Commissioning
Supply and Assembly
Metal

1997

BOSCH Braking Systems

800.000 kcal / h hot oil burner, double fuel (natural gas + fuel oil) burner supply and installation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

1995

ROBERT BOSCH AŞ

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and diesel fuel) boiler system and auxiliary plants with the civil works
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2021

OMYA

Factory-wide pipe revision, filtration unit revision and additional works.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

ŞAYAKÇI NATUREL

Various sizes of stainless hygienic water tanks.
Manufacturing
Mineral Processing

SİSTEMAS

Export project - high-capacity mixer tanks and IBC tanks.
Engineering and Design
Manufacturing
Home/Industrial Appliance

RAVAGO

Process equipment components manufacturing and assembly.
Engineering and Design
Manufacturing
Chemical

AKDENİZ CHEMSON

Powder silos, barometric condenser, reactor, acetephenone tank, melting tank, polymer production tank, catalyst solution tank, spray and pressure tank, liquid goods tank, powder silo, vibratory sieve, condenser, stainless reactor, feeding silos manufacturings.
Manufacturing
Chemical

PAKMAYA

Pipe installation and welding work.
Manufacturing
Supply and Assembly
Food
Yeast

FELDA IFFCO

Tracing line and renovation works.
Manufacturing
Food
Vegetable Oil

AZURO

Process equipment components and stainless boilers manufacturings.
Manufacturing
Chemical

ELDOR

Furnaces fans, polymerization furnaces, resolver curing furnace, curing furnaces, resin heating furnaces, conveyor preheating furnace manufacturings.
Engineering and Design
Manufacturing
Plastic

GEA

Deicing tanks, hot water tank, defrosting cups, cars, stainless tank, end caps, diecing+support manufacturings.
Engineering and Design
Manufacturing
Home/Industrial Appliance

KANSAI ALTAN

Dg installation construction.
Engineering and Design
Chemical
Dye

BUNGE

Goods preparation and extraction process. Condensate recovery revision.
Engineering and Design
Manufacturing
Food
Vegetable Oil

SCHNEIDER

Ekrt 60 furnace service.
Maintenance and Repair
Energy
Transformer and Electricity

KANSAN

Wetlaid piping line.
Engineering and Design
Manufacturing
Packaging and Paper

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

SERAMİKSAN

AISI 316L Wet Scrubber tanks were manufactured for 4 different factories of SERAMİKSAN and delivered together with the line manufacturings such as elbow, conical, chute etc.
Manufacturing
Mineral Processing
Ceramic

TAYKON

High capacity stainless steel reactor, spray dryer, cyclone, scrubber and various wash silos.
Manufacturing
Metal

BUNGE GIDA

The design, manufacture and on-site assembly of the reboiler tank and heat exchanger, which will increase the efficiency of the existing factory, have been completed and commissioned.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Food

GEA

Within the scope of a foreign trade project, 7400 liters capacity pressurized hot water tank was designed, manufactured and CE certified.
Engineering and Design
Manufacturing
Home/Industrial Appliance

GEA

5 trolleys and grit pots were produced for use in qualified processes.
Manufacturing
Home/Industrial Appliance

FELDA IFFCO

General piping and services have been provided throughout 2020.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Food
Vegetable Oil

SİSTEMAS

Within the scope of 2020 export works, 7 high-capacity tanks and heat exchangers were designed and manufactured.
Engineering and Design
Manufacturing
Home/Industrial Appliance

ENERGOPROJEKT INDUSTRIJA

2 units of stainless steel 4000lt compressed air tank design, manufacturing, CE certification in accordance with the pressure vessels directive (2014/68/EU).
Engineering and Design
Manufacturing
Energy

AKDENİZ KİMYA

One dispersion reactor has been manufactured and CE certified.
Manufacturing
Chemical

GEA

Stainless steel CIP group tanks and platform, trolley manufacturing, channel manufacturing, grit pot and solid-liquid chute manufacturing in accordance with hygienic norms for use in the food facility, 7400lt CE certified process tank design and manufacturing.
Manufacturing
Food

KANAT BOYA

Design, manufacturing and commissioning of 2 units of 4 pallet capacity electric barrel heating furnaces.
Manufacturing
Chemical
Dye

DYO

In accordance with the ATEX directive (2014/34 / EU), 2 units of 9m3 color tanks design and manufacturing with CE certification
Manufacturing
Dye

AKKİM

Designing, manufacturing and commissioning of 16-pallet capacity open steam barrel heating furnace.
Manufacturing
Chemical

TARİŞ

Manufacturing of process tanks in the range of 1000lt - 30.000lt capacity, piping, assembly, automation system revisions, commissioning, turnkey new filling line installation including construction within the scope of the capacity increase project of Cologne Production Plant,
Manufacturing
Cosmetic
Cologne

SİSTEMAS

Manufacturing of 6 units of stainless steel IBC tanks and mixers.
Manufacturing
Home/Industrial Appliance

AKDENİZ KİMYA

4 units of vibrating strainer made of stainless steel, goods storage silos with various capacities, 8m3 cold water tank, 21m3 hot water tank, 15m3 circulation water tank, 21m3 washing tank, 3m3 CE certified dispersion reactor.
Manufacturing
Chemical

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

BiLLUR TUZ

Approximately 85 m2 rusted natural gas lines have been revised andreplaced.
Installation and Commissioning
Maintenance and Repair
Food
Salt

MONDi GROUP

Manufacturing and installation of an additional 30 m PE pipe line with the same diameter as the one obtained from the Ø315 mm PE pipe line with the treatment pool was completed.
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

BAK AMBALAJ

Mechanical works of Annex of BAK building; The machine equipment disassembly and assembly, heating-cooling, air lines, ventilation ducts manufacturing and assembly of the new facility have been completed.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

Manufacturing of silos , dosing and filling equiments , conveyor chuting system with civil engineering and automation and electric panels and commissioning at Bandırma Plant.
Installation and Commissioning
Manufacturing
Mineral Processing

AKZO NOBEL

From 2003 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of AKZO NOBEL
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

KANSAI ALTAN

From 2007 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of KANSAI ALTAN
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

TUBORG & CARLSBERG

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Beverage
Alcoholic Beverage

TARiŞ

The existing İzmir cologne production plant has been moved to new plant with the new technology process design of the plant by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and commissioned delivered as turn-key.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Cosmetic
Cologne

AKDENİZ KİMYA

Design and Manufacturing of: 2 SMS Reactors, 5 Big-Bag Discharge Stations 2 0,75m2 vibrating screens, 2 granule screens, Cyclone Acetone Tanks, Scrubbers, American Silo, for the Kemalpaşa plant were made from stainless steel.
Engineering and Design
Manufacturing
Chemical

BUNGE GIDA

Solvent Separator Tank and Scrubber Tank were manufactured and delivered to Aliağa plant.
Manufacturing
Food
Vegetable Oil

TARİŞ

Manufacturing and installation of all Stainless Process Tanks and mobile dosing units required for cologne production facility were made.
Manufacturing
Cosmetic
Cologne

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

GEA WESTFALIA

Chute production for solid and liquid materials has been delivered.
Manufacturing
Pharmaceutical

2016

FELDA IFFCO

Construction of hygienic stainless installations as part of margarine, vegetable oil production and renewal of steam lines.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

FELDA IFFCO

Design and manufacturing, erection of economizer together with system piping and energy recovery measuring to the main boiler house.
Project Design and Contracting
Food
Vegetable Oil

MONDi GROUP

Replacing the 25 year old existing degasing unit and and installation of GEO design and manufactured 75t/h capacity 16 bar degassing unit to the heart of factory main steam plant within 60 hours of fast and qualitative operation of installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

The project design, mechanical installation, piping and machine installation work related to the process has been completed.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing

PAKGIDA

Within the scope of capacity increase investment, 4 Stainless Steel Mayan milk storage tanks with horizontal mixer and 37 ton capacity were completed.
Manufacturing
Food
Yeast

KANSAI ALTAN

Design, manufacture and installation of barrel heating ovens which are designed specially for Kemalpaşa / İZMİR facilities for the heating of paint raw materials in barrels and which have proportional heating of BİST-155 model, 155 kW capacity, 20 C - 90 C with steam is complete.
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical
Dye

2015

PAKGIDA

Within the scope of the project which started in the second half of 2015, various installation systems and including fresh yeast stainless tanks manufacturing and installations from Kemalpaşa-İZMİR factory have been renewed to our projects and contracting teams in accordance with hygiene and food codes.
Maintenance and Repair
Manufacturing
Project Design and Contracting
Food
Yeast

FELDA IFFCO

1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed. 2. Design and installation of new margarine stainless steel lines and equipments
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Food
Margarine

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

TUKAŞ GIDA SAN AŞ

Within the scope of the project , steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed. In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled. 2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated. Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

SÜTAŞ AŞ

Within the scope of the project which started in the second half of 2015, natural gas facilities and installations were completed in our project and contracting teams in Tire - İZMİR new factory investment.
Installation and Commissioning
Project Design and Contracting
Food
Dairy

POLİBAK

Within the scope of the project realized in İzmir / çiğli facilities, stainless steel dust collecting trolleys for dust filters were manufactured by GEO Tekno.
Manufacturing
Packaging and Paper

FELDA IFFCO

Design, manufacture, installation and commissioning work of ECO B195 economiser specially designed according to the boiler house of Felda Iffico was done.Manufacture of portable margarine tank with stainless steel MIX-1,3 No 1.300 lt mixer designed for margarine production plant,Manufacturing, installation and commissioning of 4 Stainless Steel Process Tanks with 28 tones and 31 tones of capacity for Margarine Plant.
Engineering and Design
Installation and Commissioning
Manufacturing
Food
Vegetable Oil

FELDA IFFCO

Designing and manufacturing of two margarine melting tank designs with high energy efficiency and 3000 kg/h capacity have been completed.
Engineering and Design
Manufacturing
Food
Margarine

GEA WESTFALIA

For the new oil plant to be established abroad, 10 tanks have been completed within the capacity range of 2 - 5 tons within the scope of the preliminary design projects of 100 ton / day capacity NEUTRALIZATION PLANT.1. STAINLESS STEEL TANKS- In addition to mixer and exchanger designs and manufacturing in various sizes- According to international food norms, welding and manufacturing methods,- ACID, ACID REACTION, CYTORIC ASID, SOAP and HOT WATER TANKS, VACUUM, DECENTOR AND HYDRATION TANK according to AISI 316L and 304L material standards 2. CARBON STEEL TANK- 4 tons capacity RARE OIL TANK
Manufacturing
Chemical

2014

ALTINYAĞ KOMBiNALARI AŞ

Within the scope of the project to be realized at Altınyağ facilities, the serpentine pipes of 3 oil tanks will be replaced. Assembly and commissioning are planned to be completed within 1 month
Maintenance and Repair
Supply and Assembly
Food
Vegetable Oil

OMYA MADENCiLiK SAN A Ş

The new factory investment in Kemalpaşa OSB and the whole fire systems of the plant, pump systems, fire cabinets manufacturing and installation work has been completed.
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

OMYA MADENCiLiK SAN AŞ

KOSBİ's new factory investment and whole plant fire system has been projected with "fire regulations" together with pump systems, fire cabinets and installations, manufacturing and installation works are continuing.
Installation and Commissioning
Manufacturing
Mineral Processing

BOZZETTO KiMYA SAN VE TiC AŞ

350 m, 2 "", 316 L quality stainless steel piping, and steam, hot water and cold water lines with dimentions between 300 m 2"" - 8"" were manufactured and installed.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Chemical

SİNTAN

Naphtaline silos design manufacturing and installation including piping of the system
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

BOZZETTO KiMYA SAN VE TiC AŞ

We manufactured and installed stainless steel tanks and containers for various special chemicals.
Installation and Commissioning
Manufacturing
Chemical

MONDi GROUP

75 ton / h capacity degasser and feed water tank project, production, old degasor and feed water tank system were demounted and installation, piping and commissioning of the new degasser were done.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

SCHNEIDER ELECTRIC

Designing, manufacturing and commissioning works of EKRT-60 model, 60 kW capacity, electric proportional heating controlled coil drying oven manufactured by GEO TEKNO.
Installation and Commissioning
Manufacturing
Electronics

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

New plant steel annealing furnaces natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . New plant for capacity increasing and quality improvement of sand blasting system natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning ."
Installation and Commissioning
Project Design and Contracting
Metal

FERRERO

6,5 km steam, hot water and condensate piping lines, steel pipe bridges and consoles, projecting, manufacturing and on-site installation.
Manufacturing
Supply and Assembly
Food
Chocolate

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant fire fighting system design and engineering, procurement, installation with automation and commissioning. New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning. Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

AGE ENERGY

All simple cycle steam manufacturing and installation of piping of 80 MW naturalgas fired private business entity power plant
Engineering and Design
Project Design and Contracting
Energy

NESTLE

Design and engineering, procurement, installation and commissioning of natural gas distribution to many facilies of the plant under hygenic standarts
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Chocolate

2011

OMYA MADENCiLiK SAN AŞ

Within the scope of the project realized in Kemalpaşa facilities; 1. Designing a 250 m3 stainless steel tank and realizing on-site production, 2. Design and manufacture of suitable mixer after calculations according to tank capacity 3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Mineral Processing

2010

KOROZO AMBALAJ SAN TiC AŞ

Solvents piping and ventilation system design and installation , engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

"New steel production plant whole furnaces and other facilities natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning. Role mill plant capacity increasing and quality improvement of 4th furnace natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Metal

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST Transformer AŞ

Heating and cooling of administrative building with VRF systems, air conditioning, heat recovery, hot water supply through solar energy systems.
Engineering and Design
Project Design and Contracting
Energy
Transformer and Electricity

BEST Transformer AŞ

Day lighting skylight application for interior lighting of management building, energy supply from hybrid systems including small scale wind turbines and sun tracking PV panels.
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST Transformer AŞ

"Best Elektromekanik San. Inc. Installation of Wind Turbine and Photovoltaic Piller from Renewable Energy Sources has been completed in Organize Industrial Zone Facilities Management Block. With the automation system installed, the amount of energy produced in the hybrid system has begun to be read. In addition, the management block rooms were started to be energized without electricity by ""Natural Light Lighting Fixtures"". In the management block, the use of water system, fire system, VRF system, air conditioning, conference room air conditioning, ventilation system, shelter ventilation and building hot water system were completed and put into operation."
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST ELEKTROMEKANİK A.Ş

Completed manufacturing and commissioning of 'fully automated drying furnace. A special GEO TEKNO production ECO-KRT furnace - 250 Kw capacity , provided with heating and dehumidification system, air conditioned and with gas fired burner is operated by a fully auotomated control panel.
Installation and Commissioning
Manufacturing
Energy
Transformer and Electricity

2008

OMYA MADENCiLiK SAN AŞ

Installation of P & X and Centrifuge units and other equipment within the scope of the project at Kemalpaşa facilities, in addition to process and stainless pipe works and installation of the system.
Installation and Commissioning
Manufacturing
Supply and Assembly
Mineral Processing

2007

ALCAN PACKAGING AŞ

GEO realized engineering, procurement, installation and commissioning of HVAC for new management building and cooling and ventilation duct work installation for two new package production lines together with automation and SCADA system.
Engineering and Design
Installation and Commissioning
Packaging and Paper

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2006

TAMSA SERAMiK AŞ

Engineering, procurement, installation and commissioning of natural gas installations for new process units.
Installation and Commissioning
Supply and Assembly
Mineral Processing
Ceramic

TAT KONSERVE

Engineering, procurement, installation and commissioning of natural gas system for entire factory.
Installation and Commissioning
Project Design and Contracting
Food
Canned Good

DELPHI OTOMOTIV SiSTEMLERi AŞ

Engineering, procurement, installation and commissioning of ventilation system for EUCD PUR area.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Vehicle
Automotive

2005

PHILIP MORRIS AŞ

Vacuum lines and vacuum pumping station engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Tobacco

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

EGE ENDÜSTRi SAN AŞ

Boiler room design, procurement, installation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

KLiMASAN KLiMA SAN VE TiC AŞ

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Home/Industrial Appliance

ENERCON AERO

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Energy
Wind

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

DYO Paint

Fire extinguishing pipe lines design, procurement, installation and commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Chemical
Dye

SAKIPAĞA SGS GIDA

Steam lines design, procurement, installation and commissioning.
Project Design and Contracting
Supply and Assembly
Food
Dairy

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BIANCHI BiSiKLET ENDÜSTRi AŞ

Design, procurement, installation and commissioning of natural gas lines and burners for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Bike

TAT KONSERVE

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas supply and monitoring equipments for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

BOSCH Heating and Cooling

Design, procurement, installation and commissioning of natural gas lines for entire factory
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Home/Industrial Appliance
Heating Appliance

INDESIT Company

Boiler rooms and natural gas pipelines of entire factory, engineering, procurement, installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Home/Industrial Appliance

YÖRSAN GIDA SÜT ENDÜSTRi AŞ

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Food
Dairy

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

3 MW Superheated water boiler system engineering, procurement, installation and commissioning with automation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

ROBERT BOSCH AŞ

Design of Boiler house with whole system 3 MW additional hot water boiler and installation of the entire system
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Vehicle
Automotive

1998

ERDEMİR

Erdemir No. 4 lime kiln natural gas conversion project Installation of Pressure Reduction Station
Installation and Commissioning
Supply and Assembly
Metal

1997

BOSCH Braking Systems

800.000 kcal / h hot oil burner, double fuel (natural gas + fuel oil) burner supply and installation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

1995

ROBERT BOSCH AŞ

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and diesel fuel) boiler system and auxiliary plants with the civil works
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2021

OMYA

Factory-wide pipe revision, filtration unit revision and additional works.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

SİSTEMAS

Export project - high-capacity mixer tanks and IBC tanks.
Engineering and Design
Manufacturing
Home/Industrial Appliance

RAVAGO

Process equipment components manufacturing and assembly.
Engineering and Design
Manufacturing
Chemical

ELDOR

Furnaces fans, polymerization furnaces, resolver curing furnace, curing furnaces, resin heating furnaces, conveyor preheating furnace manufacturings.
Engineering and Design
Manufacturing
Plastic

GEA

Deicing tanks, hot water tank, defrosting cups, cars, stainless tank, end caps, diecing+support manufacturings.
Engineering and Design
Manufacturing
Home/Industrial Appliance

KANSAI ALTAN

Dg installation construction.
Engineering and Design
Chemical
Dye

BUNGE

Goods preparation and extraction process. Condensate recovery revision.
Engineering and Design
Manufacturing
Food
Vegetable Oil

KANSAN

Wetlaid piping line.
Engineering and Design
Manufacturing
Packaging and Paper

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

BUNGE GIDA

The design, manufacture and on-site assembly of the reboiler tank and heat exchanger, which will increase the efficiency of the existing factory, have been completed and commissioned.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Food

GEA

Within the scope of a foreign trade project, 7400 liters capacity pressurized hot water tank was designed, manufactured and CE certified.
Engineering and Design
Manufacturing
Home/Industrial Appliance

SİSTEMAS

Within the scope of 2020 export works, 7 high-capacity tanks and heat exchangers were designed and manufactured.
Engineering and Design
Manufacturing
Home/Industrial Appliance

ENERGOPROJEKT INDUSTRIJA

2 units of stainless steel 4000lt compressed air tank design, manufacturing, CE certification in accordance with the pressure vessels directive (2014/68/EU).
Engineering and Design
Manufacturing
Energy

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

BAK AMBALAJ

Mechanical works of Annex of BAK building; The machine equipment disassembly and assembly, heating-cooling, air lines, ventilation ducts manufacturing and assembly of the new facility have been completed.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

AKZO NOBEL

From 2003 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of AKZO NOBEL
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

KANSAI ALTAN

From 2007 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of KANSAI ALTAN
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

TARiŞ

The existing İzmir cologne production plant has been moved to new plant with the new technology process design of the plant by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and commissioned delivered as turn-key.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Cosmetic
Cologne

AKDENİZ KİMYA

Design and Manufacturing of: 2 SMS Reactors, 5 Big-Bag Discharge Stations 2 0,75m2 vibrating screens, 2 granule screens, Cyclone Acetone Tanks, Scrubbers, American Silo, for the Kemalpaşa plant were made from stainless steel.
Engineering and Design
Manufacturing
Chemical

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

2016

FELDA IFFCO

Construction of hygienic stainless installations as part of margarine, vegetable oil production and renewal of steam lines.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

KANSAI ALTAN

Design, manufacture and installation of barrel heating ovens which are designed specially for Kemalpaşa / İZMİR facilities for the heating of paint raw materials in barrels and which have proportional heating of BİST-155 model, 155 kW capacity, 20 C - 90 C with steam is complete.
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical
Dye

2015

FELDA IFFCO

1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed. 2. Design and installation of new margarine stainless steel lines and equipments
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Food
Margarine

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

FELDA IFFCO

Design, manufacture, installation and commissioning work of ECO B195 economiser specially designed according to the boiler house of Felda Iffico was done.Manufacture of portable margarine tank with stainless steel MIX-1,3 No 1.300 lt mixer designed for margarine production plant,Manufacturing, installation and commissioning of 4 Stainless Steel Process Tanks with 28 tones and 31 tones of capacity for Margarine Plant.
Engineering and Design
Installation and Commissioning
Manufacturing
Food
Vegetable Oil

FELDA IFFCO

Designing and manufacturing of two margarine melting tank designs with high energy efficiency and 3000 kg/h capacity have been completed.
Engineering and Design
Manufacturing
Food
Margarine

2014

SİNTAN

Naphtaline silos design manufacturing and installation including piping of the system
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant fire fighting system design and engineering, procurement, installation with automation and commissioning. New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning. Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

AGE ENERGY

All simple cycle steam manufacturing and installation of piping of 80 MW naturalgas fired private business entity power plant
Engineering and Design
Project Design and Contracting
Energy

2011

OMYA MADENCiLiK SAN AŞ

Within the scope of the project realized in Kemalpaşa facilities; 1. Designing a 250 m3 stainless steel tank and realizing on-site production, 2. Design and manufacture of suitable mixer after calculations according to tank capacity 3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Mineral Processing

2010

ÖZKAN DEMiR ÇELiK SAN AŞ

"New steel production plant whole furnaces and other facilities natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning. Role mill plant capacity increasing and quality improvement of 4th furnace natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Metal

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST Transformer AŞ

Heating and cooling of administrative building with VRF systems, air conditioning, heat recovery, hot water supply through solar energy systems.
Engineering and Design
Project Design and Contracting
Energy
Transformer and Electricity

2007

ALCAN PACKAGING AŞ

GEO realized engineering, procurement, installation and commissioning of HVAC for new management building and cooling and ventilation duct work installation for two new package production lines together with automation and SCADA system.
Engineering and Design
Installation and Commissioning
Packaging and Paper

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2005

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BOSCH Heating and Cooling

Design, procurement, installation and commissioning of natural gas lines for entire factory
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Home/Industrial Appliance
Heating Appliance

YÖRSAN GIDA SÜT ENDÜSTRi AŞ

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Food
Dairy

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

Design of Boiler house with whole system 3 MW additional hot water boiler and installation of the entire system
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Vehicle
Automotive

2021

OMYA

Factory-wide pipe revision, filtration unit revision and additional works.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

FELDA IFFCO

General piping and services have been provided throughout 2020.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Food
Vegetable Oil

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

BAK AMBALAJ

Mechanical works of Annex of BAK building; The machine equipment disassembly and assembly, heating-cooling, air lines, ventilation ducts manufacturing and assembly of the new facility have been completed.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

KANSAI ALTAN

From 2007 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of KANSAI ALTAN
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

TUBORG & CARLSBERG

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Beverage
Alcoholic Beverage

TARiŞ

The existing İzmir cologne production plant has been moved to new plant with the new technology process design of the plant by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and commissioned delivered as turn-key.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Cosmetic
Cologne

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

2016

FELDA IFFCO

Construction of hygienic stainless installations as part of margarine, vegetable oil production and renewal of steam lines.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

FELDA IFFCO

Design and manufacturing, erection of economizer together with system piping and energy recovery measuring to the main boiler house.
Project Design and Contracting
Food
Vegetable Oil

OMYA MADENCiLiK SAN AŞ

The project design, mechanical installation, piping and machine installation work related to the process has been completed.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing

2015

PAKGIDA

Within the scope of the project which started in the second half of 2015, various installation systems and including fresh yeast stainless tanks manufacturing and installations from Kemalpaşa-İZMİR factory have been renewed to our projects and contracting teams in accordance with hygiene and food codes.
Maintenance and Repair
Manufacturing
Project Design and Contracting
Food
Yeast

FELDA IFFCO

1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed. 2. Design and installation of new margarine stainless steel lines and equipments
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Food
Margarine

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

TUKAŞ GIDA SAN AŞ

Within the scope of the project , steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed. In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled. 2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated. Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

SÜTAŞ AŞ

Within the scope of the project which started in the second half of 2015, natural gas facilities and installations were completed in our project and contracting teams in Tire - İZMİR new factory investment.
Installation and Commissioning
Project Design and Contracting
Food
Dairy

2014

OMYA MADENCiLiK SAN A Ş

The new factory investment in Kemalpaşa OSB and the whole fire systems of the plant, pump systems, fire cabinets manufacturing and installation work has been completed.
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

BOZZETTO KiMYA SAN VE TiC AŞ

350 m, 2 "", 316 L quality stainless steel piping, and steam, hot water and cold water lines with dimentions between 300 m 2"" - 8"" were manufactured and installed.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Chemical

MONDi GROUP

75 ton / h capacity degasser and feed water tank project, production, old degasor and feed water tank system were demounted and installation, piping and commissioning of the new degasser were done.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

New plant steel annealing furnaces natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . New plant for capacity increasing and quality improvement of sand blasting system natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning ."
Installation and Commissioning
Project Design and Contracting
Metal

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant fire fighting system design and engineering, procurement, installation with automation and commissioning. New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning. Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

AGE ENERGY

All simple cycle steam manufacturing and installation of piping of 80 MW naturalgas fired private business entity power plant
Engineering and Design
Project Design and Contracting
Energy

NESTLE

Design and engineering, procurement, installation and commissioning of natural gas distribution to many facilies of the plant under hygenic standarts
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Chocolate

2011

OMYA MADENCiLiK SAN AŞ

Within the scope of the project realized in Kemalpaşa facilities; 1. Designing a 250 m3 stainless steel tank and realizing on-site production, 2. Design and manufacture of suitable mixer after calculations according to tank capacity 3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Mineral Processing

2010

KOROZO AMBALAJ SAN TiC AŞ

Solvents piping and ventilation system design and installation , engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Packaging and Paper

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST Transformer AŞ

Heating and cooling of administrative building with VRF systems, air conditioning, heat recovery, hot water supply through solar energy systems.
Engineering and Design
Project Design and Contracting
Energy
Transformer and Electricity

2007

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2006

TAT KONSERVE

Engineering, procurement, installation and commissioning of natural gas system for entire factory.
Installation and Commissioning
Project Design and Contracting
Food
Canned Good

DELPHI OTOMOTIV SiSTEMLERi AŞ

Engineering, procurement, installation and commissioning of ventilation system for EUCD PUR area.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Vehicle
Automotive

2005

PHILIP MORRIS AŞ

Vacuum lines and vacuum pumping station engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Tobacco

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

EGE ENDÜSTRi SAN AŞ

Boiler room design, procurement, installation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

KLiMASAN KLiMA SAN VE TiC AŞ

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Home/Industrial Appliance

ENERCON AERO

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Energy
Wind

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

DYO Paint

Fire extinguishing pipe lines design, procurement, installation and commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Chemical
Dye

SAKIPAĞA SGS GIDA

Steam lines design, procurement, installation and commissioning.
Project Design and Contracting
Supply and Assembly
Food
Dairy

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BIANCHI BiSiKLET ENDÜSTRi AŞ

Design, procurement, installation and commissioning of natural gas lines and burners for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Bike

TAT KONSERVE

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas supply and monitoring equipments for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

BOSCH Heating and Cooling

Design, procurement, installation and commissioning of natural gas lines for entire factory
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Home/Industrial Appliance
Heating Appliance

YÖRSAN GIDA SÜT ENDÜSTRi AŞ

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Food
Dairy

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

Design of Boiler house with whole system 3 MW additional hot water boiler and installation of the entire system
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Vehicle
Automotive

1995

ROBERT BOSCH AŞ

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and diesel fuel) boiler system and auxiliary plants with the civil works
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2021

OMYA

Factory-wide pipe revision, filtration unit revision and additional works.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

PAKMAYA

Pipe installation and welding work.
Manufacturing
Supply and Assembly
Food
Yeast

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

MONDi GROUP

Manufacturing and installation of an additional 30 m PE pipe line with the same diameter as the one obtained from the Ø315 mm PE pipe line with the treatment pool was completed.
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

KANSAI ALTAN

From 2007 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of KANSAI ALTAN
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

TUBORG & CARLSBERG

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Beverage
Alcoholic Beverage

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

2016

FELDA IFFCO

Construction of hygienic stainless installations as part of margarine, vegetable oil production and renewal of steam lines.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

MONDi GROUP

Replacing the 25 year old existing degasing unit and and installation of GEO design and manufactured 75t/h capacity 16 bar degassing unit to the heart of factory main steam plant within 60 hours of fast and qualitative operation of installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

The project design, mechanical installation, piping and machine installation work related to the process has been completed.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing

2015

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

TUKAŞ GIDA SAN AŞ

Within the scope of the project , steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed. In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled. 2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated. Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

2014

ALTINYAĞ KOMBiNALARI AŞ

Within the scope of the project to be realized at Altınyağ facilities, the serpentine pipes of 3 oil tanks will be replaced. Assembly and commissioning are planned to be completed within 1 month
Maintenance and Repair
Supply and Assembly
Food
Vegetable Oil

OMYA MADENCiLiK SAN A Ş

The new factory investment in Kemalpaşa OSB and the whole fire systems of the plant, pump systems, fire cabinets manufacturing and installation work has been completed.
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

FERRERO

6,5 km steam, hot water and condensate piping lines, steel pipe bridges and consoles, projecting, manufacturing and on-site installation.
Manufacturing
Supply and Assembly
Food
Chocolate

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant fire fighting system design and engineering, procurement, installation with automation and commissioning. New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning. Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

NESTLE

Design and engineering, procurement, installation and commissioning of natural gas distribution to many facilies of the plant under hygenic standarts
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Chocolate

2010

KOROZO AMBALAJ SAN TiC AŞ

Solvents piping and ventilation system design and installation , engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Packaging and Paper

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST Transformer AŞ

Day lighting skylight application for interior lighting of management building, energy supply from hybrid systems including small scale wind turbines and sun tracking PV panels.
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST Transformer AŞ

"Best Elektromekanik San. Inc. Installation of Wind Turbine and Photovoltaic Piller from Renewable Energy Sources has been completed in Organize Industrial Zone Facilities Management Block. With the automation system installed, the amount of energy produced in the hybrid system has begun to be read. In addition, the management block rooms were started to be energized without electricity by ""Natural Light Lighting Fixtures"". In the management block, the use of water system, fire system, VRF system, air conditioning, conference room air conditioning, ventilation system, shelter ventilation and building hot water system were completed and put into operation."
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

2008

OMYA MADENCiLiK SAN AŞ

Installation of P & X and Centrifuge units and other equipment within the scope of the project at Kemalpaşa facilities, in addition to process and stainless pipe works and installation of the system.
Installation and Commissioning
Manufacturing
Supply and Assembly
Mineral Processing

2007

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2006

TAMSA SERAMiK AŞ

Engineering, procurement, installation and commissioning of natural gas installations for new process units.
Installation and Commissioning
Supply and Assembly
Mineral Processing
Ceramic

2005

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

EGE ENDÜSTRi SAN AŞ

Boiler room design, procurement, installation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

KLiMASAN KLiMA SAN VE TiC AŞ

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Home/Industrial Appliance

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

DYO Paint

Fire extinguishing pipe lines design, procurement, installation and commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Chemical
Dye

SAKIPAĞA SGS GIDA

Steam lines design, procurement, installation and commissioning.
Project Design and Contracting
Supply and Assembly
Food
Dairy

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BIANCHI BiSiKLET ENDÜSTRi AŞ

Design, procurement, installation and commissioning of natural gas lines and burners for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Bike

TAT KONSERVE

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas supply and monitoring equipments for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

INDESIT Company

Boiler rooms and natural gas pipelines of entire factory, engineering, procurement, installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Home/Industrial Appliance

YÖRSAN GIDA SÜT ENDÜSTRi AŞ

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.
Engineering and Design
Project Design and Contracting
Supply and Assembly
Food
Dairy

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

3 MW Superheated water boiler system engineering, procurement, installation and commissioning with automation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

1998

ERDEMİR

Erdemir No. 4 lime kiln natural gas conversion project Installation of Pressure Reduction Station
Installation and Commissioning
Supply and Assembly
Metal

1997

BOSCH Braking Systems

800.000 kcal / h hot oil burner, double fuel (natural gas + fuel oil) burner supply and installation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

1995

ROBERT BOSCH AŞ

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and diesel fuel) boiler system and auxiliary plants with the civil works
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2020

OMYA MADENCiLiK SAN AŞ

From 2007 to today, GEO is carrying out manufacturing and installation works of many OMYA plants and facilities.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Mineral Processing

BUNGE GIDA

The design, manufacture and on-site assembly of the reboiler tank and heat exchanger, which will increase the efficiency of the existing factory, have been completed and commissioned.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Food

FELDA IFFCO

General piping and services have been provided throughout 2020.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Food
Vegetable Oil

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

BiLLUR TUZ

Approximately 85 m2 rusted natural gas lines have been revised andreplaced.
Installation and Commissioning
Maintenance and Repair
Food
Salt

MONDi GROUP

Manufacturing and installation of an additional 30 m PE pipe line with the same diameter as the one obtained from the Ø315 mm PE pipe line with the treatment pool was completed.
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

BAK AMBALAJ

Mechanical works of Annex of BAK building; The machine equipment disassembly and assembly, heating-cooling, air lines, ventilation ducts manufacturing and assembly of the new facility have been completed.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

Manufacturing of silos , dosing and filling equiments , conveyor chuting system with civil engineering and automation and electric panels and commissioning at Bandırma Plant.
Installation and Commissioning
Manufacturing
Mineral Processing

AKZO NOBEL

From 2003 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of AKZO NOBEL
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

TUBORG & CARLSBERG

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Beverage
Alcoholic Beverage

TARiŞ

The existing İzmir cologne production plant has been moved to new plant with the new technology process design of the plant by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and commissioned delivered as turn-key.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Cosmetic
Cologne

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

2016

MONDi GROUP

Replacing the 25 year old existing degasing unit and and installation of GEO design and manufactured 75t/h capacity 16 bar degassing unit to the heart of factory main steam plant within 60 hours of fast and qualitative operation of installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

The project design, mechanical installation, piping and machine installation work related to the process has been completed.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing

KANSAI ALTAN

Design, manufacture and installation of barrel heating ovens which are designed specially for Kemalpaşa / İZMİR facilities for the heating of paint raw materials in barrels and which have proportional heating of BİST-155 model, 155 kW capacity, 20 C - 90 C with steam is complete.
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical
Dye

2015

FELDA IFFCO

1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed. 2. Design and installation of new margarine stainless steel lines and equipments
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Food
Margarine

FELDA IFFCO

Margarine production plant design, manufacturing, erection together with 4 stainless reactor tanks ( 28 tons, 31 tons with mixers) , 1300 lt mixer with heat exchanger at margarine plant.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

TUKAŞ GIDA SAN AŞ

Within the scope of the project , steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed. In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled. 2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated. Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
Installation and Commissioning
Maintenance and Repair
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

SÜTAŞ AŞ

Within the scope of the project which started in the second half of 2015, natural gas facilities and installations were completed in our project and contracting teams in Tire - İZMİR new factory investment.
Installation and Commissioning
Project Design and Contracting
Food
Dairy

FELDA IFFCO

Design, manufacture, installation and commissioning work of ECO B195 economiser specially designed according to the boiler house of Felda Iffico was done.Manufacture of portable margarine tank with stainless steel MIX-1,3 No 1.300 lt mixer designed for margarine production plant,Manufacturing, installation and commissioning of 4 Stainless Steel Process Tanks with 28 tones and 31 tones of capacity for Margarine Plant.
Engineering and Design
Installation and Commissioning
Manufacturing
Food
Vegetable Oil

2014

OMYA MADENCiLiK SAN AŞ

KOSBİ's new factory investment and whole plant fire system has been projected with "fire regulations" together with pump systems, fire cabinets and installations, manufacturing and installation works are continuing.
Installation and Commissioning
Manufacturing
Mineral Processing

BOZZETTO KiMYA SAN VE TiC AŞ

350 m, 2 "", 316 L quality stainless steel piping, and steam, hot water and cold water lines with dimentions between 300 m 2"" - 8"" were manufactured and installed.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Chemical

SİNTAN

Naphtaline silos design manufacturing and installation including piping of the system
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

BOZZETTO KiMYA SAN VE TiC AŞ

We manufactured and installed stainless steel tanks and containers for various special chemicals.
Installation and Commissioning
Manufacturing
Chemical

MONDi GROUP

75 ton / h capacity degasser and feed water tank project, production, old degasor and feed water tank system were demounted and installation, piping and commissioning of the new degasser were done.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

SCHNEIDER ELECTRIC

Designing, manufacturing and commissioning works of EKRT-60 model, 60 kW capacity, electric proportional heating controlled coil drying oven manufactured by GEO TEKNO.
Installation and Commissioning
Manufacturing
Electronics

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

New plant steel annealing furnaces natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . New plant for capacity increasing and quality improvement of sand blasting system natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning ."
Installation and Commissioning
Project Design and Contracting
Metal

NESTLE

Design and engineering, procurement, installation and commissioning of natural gas distribution to many facilies of the plant under hygenic standarts
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Chocolate

2011

OMYA MADENCiLiK SAN AŞ

Within the scope of the project realized in Kemalpaşa facilities; 1. Designing a 250 m3 stainless steel tank and realizing on-site production, 2. Design and manufacture of suitable mixer after calculations according to tank capacity 3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Mineral Processing

2010

KOROZO AMBALAJ SAN TiC AŞ

Solvents piping and ventilation system design and installation , engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Packaging and Paper

ÖZKAN DEMiR ÇELiK SAN AŞ

"New steel production plant whole furnaces and other facilities natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning. Role mill plant capacity increasing and quality improvement of 4th furnace natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Metal

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST Transformer AŞ

Day lighting skylight application for interior lighting of management building, energy supply from hybrid systems including small scale wind turbines and sun tracking PV panels.
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST Transformer AŞ

"Best Elektromekanik San. Inc. Installation of Wind Turbine and Photovoltaic Piller from Renewable Energy Sources has been completed in Organize Industrial Zone Facilities Management Block. With the automation system installed, the amount of energy produced in the hybrid system has begun to be read. In addition, the management block rooms were started to be energized without electricity by ""Natural Light Lighting Fixtures"". In the management block, the use of water system, fire system, VRF system, air conditioning, conference room air conditioning, ventilation system, shelter ventilation and building hot water system were completed and put into operation."
Installation and Commissioning
Supply and Assembly
Energy
Transformer and Electricity

BEST ELEKTROMEKANİK A.Ş

Completed manufacturing and commissioning of 'fully automated drying furnace. A special GEO TEKNO production ECO-KRT furnace - 250 Kw capacity , provided with heating and dehumidification system, air conditioned and with gas fired burner is operated by a fully auotomated control panel.
Installation and Commissioning
Manufacturing
Energy
Transformer and Electricity

2008

OMYA MADENCiLiK SAN AŞ

Installation of P & X and Centrifuge units and other equipment within the scope of the project at Kemalpaşa facilities, in addition to process and stainless pipe works and installation of the system.
Installation and Commissioning
Manufacturing
Supply and Assembly
Mineral Processing

2007

ALCAN PACKAGING AŞ

GEO realized engineering, procurement, installation and commissioning of HVAC for new management building and cooling and ventilation duct work installation for two new package production lines together with automation and SCADA system.
Engineering and Design
Installation and Commissioning
Packaging and Paper

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2006

TAMSA SERAMiK AŞ

Engineering, procurement, installation and commissioning of natural gas installations for new process units.
Installation and Commissioning
Supply and Assembly
Mineral Processing
Ceramic

TAT KONSERVE

Engineering, procurement, installation and commissioning of natural gas system for entire factory.
Installation and Commissioning
Project Design and Contracting
Food
Canned Good

DELPHI OTOMOTIV SiSTEMLERi AŞ

Engineering, procurement, installation and commissioning of ventilation system for EUCD PUR area.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Vehicle
Automotive

2005

PHILIP MORRIS AŞ

Vacuum lines and vacuum pumping station engineering, procurement, installation and commissioning.
Installation and Commissioning
Project Design and Contracting
Tobacco

IMPERIAL TOBACCO

Vacuum lines and pumping station design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Tobacco

TUKAŞ GIDA SAN AŞ

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

EGE ENDÜSTRi SAN AŞ

Boiler room design, procurement, installation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

KLiMASAN KLiMA SAN VE TiC AŞ

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Home/Industrial Appliance

ENERCON AERO

Boiler room design, procurement, installation with automation and commissioning
Installation and Commissioning
Project Design and Contracting
Energy
Wind

Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2004

HUGO BOSS

Design, procurement, installation and commissioning of natural gas lines, C-type 2000Nm3/h RMS. LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Textile

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

İNCİ GS YUASA

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2003

BIANCHI BiSiKLET ENDÜSTRi AŞ

Design, procurement, installation and commissioning of natural gas lines and burners for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Bike

TAT KONSERVE

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas supply and monitoring equipments for entire factory.
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Sauce and Puree

BOSCH Heating and Cooling

Design, procurement, installation and commissioning of natural gas lines for entire factory
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Home/Industrial Appliance
Heating Appliance

INDESIT Company

Boiler rooms and natural gas pipelines of entire factory, engineering, procurement, installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Home/Industrial Appliance

2002

TAMSA SERAMiK AŞ

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Mineral Processing
Ceramic

2000

HENKEL TURYAĞ

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Food
Margarine

1999

ROBERT BOSCH AŞ

3 MW Superheated water boiler system engineering, procurement, installation and commissioning with automation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

ROBERT BOSCH AŞ

Design of Boiler house with whole system 3 MW additional hot water boiler and installation of the entire system
Engineering and Design
Installation and Commissioning
Project Design and Contracting
Vehicle
Automotive

1998

ERDEMİR

Erdemir No. 4 lime kiln natural gas conversion project Installation of Pressure Reduction Station
Installation and Commissioning
Supply and Assembly
Metal

1997

BOSCH Braking Systems

800.000 kcal / h hot oil burner, double fuel (natural gas + fuel oil) burner supply and installation.
Installation and Commissioning
Supply and Assembly
Vehicle
Automotive

1995

ROBERT BOSCH AŞ

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and diesel fuel) boiler system and auxiliary plants with the civil works
Installation and Commissioning
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2021

OMYA

Factory-wide pipe revision, filtration unit revision and additional works.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

ŞAYAKÇI NATUREL

Various sizes of stainless hygienic water tanks.
Manufacturing
Mineral Processing

SİSTEMAS

Export project - high-capacity mixer tanks and IBC tanks.
Engineering and Design
Manufacturing
Home/Industrial Appliance

RAVAGO

Process equipment components manufacturing and assembly.
Engineering and Design
Manufacturing
Chemical

AKDENİZ CHEMSON

Powder silos, barometric condenser, reactor, acetephenone tank, melting tank, polymer production tank, catalyst solution tank, spray and pressure tank, liquid goods tank, powder silo, vibratory sieve, condenser, stainless reactor, feeding silos manufacturings.
Manufacturing
Chemical

PAKMAYA

Pipe installation and welding work.
Manufacturing
Supply and Assembly
Food
Yeast

FELDA IFFCO

Tracing line and renovation works.
Manufacturing
Food
Vegetable Oil

AZURO

Process equipment components and stainless boilers manufacturings.
Manufacturing
Chemical

ELDOR

Furnaces fans, polymerization furnaces, resolver curing furnace, curing furnaces, resin heating furnaces, conveyor preheating furnace manufacturings.
Engineering and Design
Manufacturing
Plastic

GEA

Deicing tanks, hot water tank, defrosting cups, cars, stainless tank, end caps, diecing+support manufacturings.
Engineering and Design
Manufacturing
Home/Industrial Appliance

BUNGE

Goods preparation and extraction process. Condensate recovery revision.
Engineering and Design
Manufacturing
Food
Vegetable Oil

KANSAN

Wetlaid piping line.
Engineering and Design
Manufacturing
Packaging and Paper

2020

GEA

Stainless steel CIP group tanks and platform, trolley manufacturing, channel manufacturing, grit pot and solid-liquid chute manufacturing in accordance with hygienic norms for use in the food facility, 7400lt CE certified process tank design and manufacturing.
Manufacturing
Food

DYO

In accordance with the ATEX directive (2014/34 / EU), 2 units of 9m3 color tanks design and manufacturing with CE certification
Manufacturing
Dye

KANAT BOYA

Design, manufacturing and commissioning of 2 units of 4 pallet capacity electric barrel heating furnaces.
Manufacturing
Chemical
Dye

AKKİM

Designing, manufacturing and commissioning of 16-pallet capacity open steam barrel heating furnace.
Manufacturing
Chemical

TARİŞ

Manufacturing of process tanks in the range of 1000lt - 30.000lt capacity, piping, assembly, automation system revisions, commissioning, turnkey new filling line installation including construction within the scope of the capacity increase project of Cologne Production Plant,
Manufacturing
Cosmetic
Cologne

SİSTEMAS

Manufacturing of 6 units of stainless steel IBC tanks and mixers.
Manufacturing
Home/Industrial Appliance

AKDENİZ KİMYA

4 units of vibrating strainer made of stainless steel, goods storage silos with various capacities, 8m3 cold water tank, 21m3 hot water tank, 15m3 circulation water tank, 21m3 washing tank, 3m3 CE certified dispersion reactor.
Manufacturing
Chemical

SERAMİKSAN

AISI 316L Wet Scrubber tanks were manufactured for 4 different factories of SERAMİKSAN and delivered together with the line manufacturings such as elbow, conical, chute etc.
Manufacturing
Mineral Processing
Ceramic

TAYKON

High capacity stainless steel reactor, spray dryer, cyclone, scrubber and various wash silos.
Manufacturing
Metal

BUNGE GIDA

The design, manufacture and on-site assembly of the reboiler tank and heat exchanger, which will increase the efficiency of the existing factory, have been completed and commissioned.
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Food

GEA

Within the scope of a foreign trade project, 7400 liters capacity pressurized hot water tank was designed, manufactured and CE certified.
Engineering and Design
Manufacturing
Home/Industrial Appliance

GEA

5 trolleys and grit pots were produced for use in qualified processes.
Manufacturing
Home/Industrial Appliance

SİSTEMAS

Within the scope of 2020 export works, 7 high-capacity tanks and heat exchangers were designed and manufactured.
Engineering and Design
Manufacturing
Home/Industrial Appliance

ENERGOPROJEKT INDUSTRIJA

2 units of stainless steel 4000lt compressed air tank design, manufacturing, CE certification in accordance with the pressure vessels directive (2014/68/EU).
Engineering and Design
Manufacturing
Energy

AKDENİZ KİMYA

One dispersion reactor has been manufactured and CE certified.
Manufacturing
Chemical

2019

GALATA CHEMICALS

Design and manufacture of complete PVC Stabilizor Plant with full automation systems . The plant consists of 11 raw materail and special additive products in between 2-9.000 lt's , blower system with transfer chutes to the mixer , from mixer to the 2 product silos 7600 lt's per each , filling and packaging system equiped with blade and divertor valves sensor and automation units with compressed air
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

2018

MONDi GROUP

Manufacturing and installation of an additional 30 m PE pipe line with the same diameter as the one obtained from the Ø315 mm PE pipe line with the treatment pool was completed.
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

BAK AMBALAJ

Mechanical works of Annex of BAK building; The machine equipment disassembly and assembly, heating-cooling, air lines, ventilation ducts manufacturing and assembly of the new facility have been completed.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

OMYA MADENCiLiK SAN AŞ

Manufacturing of silos , dosing and filling equiments , conveyor chuting system with civil engineering and automation and electric panels and commissioning at Bandırma Plant.
Installation and Commissioning
Manufacturing
Mineral Processing

AKZO NOBEL

From 2003 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of AKZO NOBEL
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

KANSAI ALTAN

From 2007 to today, GEO has carried out manufacturing and installation works of natural gas design and installation works of KANSAI ALTAN
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Chemical

TARiŞ

The existing İzmir cologne production plant has been moved to new plant with the new technology process design of the plant by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and commissioned delivered as turn-key.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Cosmetic
Cologne

AKDENİZ KİMYA

Design and Manufacturing of: 2 SMS Reactors, 5 Big-Bag Discharge Stations 2 0,75m2 vibrating screens, 2 granule screens, Cyclone Acetone Tanks, Scrubbers, American Silo, for the Kemalpaşa plant were made from stainless steel.
Engineering and Design
Manufacturing
Chemical

BUNGE GIDA

Solvent Separator Tank and Scrubber Tank were manufactured and delivered to Aliağa plant.
Manufacturing
Food
Vegetable Oil

TARİŞ

Manufacturing and installation of all Stainless Process Tanks and mobile dosing units required for cologne production facility were made.
Manufacturing
Cosmetic
Cologne

2017

BUNGE

The Hexane plant at Aliağa factory has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

POLİBAK

Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories. With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed. By this "" solvent recovery"" investment global atmosphere has been protected . 130 tons of big diameter solvent collecting channels manufactured and installed together with many equipments distillation units and 7 km stainless piping by GEO
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

GEA WESTFALIA

Chute production for solid and liquid materials has been delivered.
Manufacturing
Pharmaceutical

2016

FELDA IFFCO

Construction of hygienic stainless installations as part of margarine, vegetable oil production and renewal of steam lines.
Engineering and Design
Manufacturing
Project Design and Contracting
Supply and Assembly
Food
Vegetable Oil

MONDi GROUP

Replacing the 25 year old existing degasing unit and and installation of GEO design and manufactured 75t/h capacity 16 bar degassing unit to the heart of factory main steam plant within 60 hours of fast and qualitative operation of installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Packaging and Paper

PAKGIDA

Within the scope of capacity increase investment, 4 Stainless Steel Mayan milk storage tanks with horizontal mixer and 37 ton capacity were completed.
Manufacturing
Food
Yeast

KANSAI ALTAN

Design, manufacture and installation of barrel heating ovens which are designed specially for Kemalpaşa / İZMİR facilities for the heating of paint raw materials in barrels and which have proportional heating of BİST-155 model, 155 kW capacity, 20 C - 90 C with steam is complete.
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical
Dye

2015

PAKGIDA

Within the scope of the project which started in the second half of 2015, various installation systems and including fresh yeast stainless tanks manufacturing and installations from Kemalpaşa-İZMİR factory have been renewed to our projects and contracting teams in accordance with hygiene and food codes.
Maintenance and Repair
Manufacturing
Project Design and Contracting
Food
Yeast

FELDA IFFCO

1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed. 2. Design and installation of new margarine stainless steel lines and equipments
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Food
Margarine

POLİBAK

Within the scope of the project realized in İzmir / çiğli facilities, stainless steel dust collecting trolleys for dust filters were manufactured by GEO Tekno.
Manufacturing
Packaging and Paper

FELDA IFFCO

Design, manufacture, installation and commissioning work of ECO B195 economiser specially designed according to the boiler house of Felda Iffico was done.Manufacture of portable margarine tank with stainless steel MIX-1,3 No 1.300 lt mixer designed for margarine production plant,Manufacturing, installation and commissioning of 4 Stainless Steel Process Tanks with 28 tones and 31 tones of capacity for Margarine Plant.
Engineering and Design
Installation and Commissioning
Manufacturing
Food
Vegetable Oil

FELDA IFFCO

Designing and manufacturing of two margarine melting tank designs with high energy efficiency and 3000 kg/h capacity have been completed.
Engineering and Design
Manufacturing
Food
Margarine

GEA WESTFALIA

For the new oil plant to be established abroad, 10 tanks have been completed within the capacity range of 2 - 5 tons within the scope of the preliminary design projects of 100 ton / day capacity NEUTRALIZATION PLANT.1. STAINLESS STEEL TANKS- In addition to mixer and exchanger designs and manufacturing in various sizes- According to international food norms, welding and manufacturing methods,- ACID, ACID REACTION, CYTORIC ASID, SOAP and HOT WATER TANKS, VACUUM, DECENTOR AND HYDRATION TANK according to AISI 316L and 304L material standards 2. CARBON STEEL TANK- 4 tons capacity RARE OIL TANK
Manufacturing
Chemical

2014

OMYA MADENCiLiK SAN A Ş

The new factory investment in Kemalpaşa OSB and the whole fire systems of the plant, pump systems, fire cabinets manufacturing and installation work has been completed.
Manufacturing
Project Design and Contracting
Supply and Assembly
Mineral Processing

OMYA MADENCiLiK SAN AŞ

KOSBİ's new factory investment and whole plant fire system has been projected with "fire regulations" together with pump systems, fire cabinets and installations, manufacturing and installation works are continuing.
Installation and Commissioning
Manufacturing
Mineral Processing

BOZZETTO KiMYA SAN VE TiC AŞ

350 m, 2 "", 316 L quality stainless steel piping, and steam, hot water and cold water lines with dimentions between 300 m 2"" - 8"" were manufactured and installed.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Chemical

SİNTAN

Naphtaline silos design manufacturing and installation including piping of the system
Engineering and Design
Installation and Commissioning
Manufacturing
Chemical

BOZZETTO KiMYA SAN VE TiC AŞ

We manufactured and installed stainless steel tanks and containers for various special chemicals.
Installation and Commissioning
Manufacturing
Chemical

MONDi GROUP

75 ton / h capacity degasser and feed water tank project, production, old degasor and feed water tank system were demounted and installation, piping and commissioning of the new degasser were done.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Packaging and Paper

SCHNEIDER ELECTRIC

Designing, manufacturing and commissioning works of EKRT-60 model, 60 kW capacity, electric proportional heating controlled coil drying oven manufactured by GEO TEKNO.
Installation and Commissioning
Manufacturing
Electronics

2013

MOSB- Manisa Organized Region

3*20 MW Gas Turbines inlet air cooling , with fully renewable-heat recovery using from the flue gas , adsorption chiller system design and installation with complete reasourver tanks piping automation together with scada system. Operating for years around yearly %10 increase in electricity production
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization
Industrial Zone

Various Companies

"New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems , fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning BTM A.Ş Kemalpaşa-İZMİR 2013 COMPONENTA A.Ş Manisa OSB 2013 ÇUKUROVA A.Ş Manisa OSB 2013 KANSAİ ALTAN A.Ş Kemalpaşa- İZMİR 2013 ESBAŞ A.Ş Gaziemir-İZMİR 2013 EGE GÜBRE A.Ş Aliağa-İZMİR 2013 POLİNAS A.Ş Manisa OSB 2013 YÖRSAN A.Ş FAST FOOD Susurluk – BALIKESİR 2013"
Engineering and Design
Installation and Commissioning
Maintenance and Repair
Manufacturing
Project Design and Contracting
Supply and Assembly
Institution and Organization

2012

AMCOR AMBALAJ AŞ

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Packaging and Paper

FERRERO

6,5 km steam, hot water and condensate piping lines, steel pipe bridges and consoles, projecting, manufacturing and on-site installation.
Manufacturing
Supply and Assembly
Food
Chocolate

2011

OMYA MADENCiLiK SAN AŞ

Within the scope of the project realized in Kemalpaşa facilities; 1. Designing a 250 m3 stainless steel tank and realizing on-site production, 2. Design and manufacture of suitable mixer after calculations according to tank capacity 3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Mineral Processing

2010

YARIŞ KABiN SAN AŞ

In Organized Region Factory ; New plant administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning . Fire fighting system design and engineering, procurement, installation with automation and commissioning of whole factory . New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Vehicle
Automotive

2009

BEST ELEKTROMEKANİK A.Ş

Completed manufacturing and commissioning of 'fully automated drying furnace. A special GEO TEKNO production ECO-KRT furnace - 250 Kw capacity , provided with heating and dehumidification system, air conditioned and with gas fired burner is operated by a fully auotomated control panel.
Installation and Commissioning
Manufacturing
Energy
Transformer and Electricity

2008

OMYA MADENCiLiK SAN AŞ

Installation of P & X and Centrifuge units and other equipment within the scope of the project at Kemalpaşa facilities, in addition to process and stainless pipe works and installation of the system.
Installation and Commissioning
Manufacturing
Supply and Assembly
Mineral Processing

2007

BEST TRANSFORMER AŞ

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Energy
Transformer and Electricity

2006

DELPHI OTOMOTIV SiSTEMLERi AŞ

Engineering, procurement, installation and commissioning of ventilation system for EUCD PUR area.
Installation and Commissioning
Manufacturing
Project Design and Contracting
Vehicle
Automotive

2004

ÖZKAN DEMiR ÇELiK SAN AŞ

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.
Engineering and Design
Installation and Commissioning
Manufacturing
Project Design and Contracting
Supply and Assembly
Metal

2003

INDESIT Company

Boiler rooms and natural gas pipelines of entire factory, engineering, procurement, installation and commissioning
Installation and Commissioning
Manufacturing
Supply and Assembly
Home/Industrial Appliance